A coordinated system can reduce dependence on a local grid connection where the site, duty cycle and component interfaces are properly defined.

System Scope and Components

A project discussion may include a photovoltaic panel, battery, controller or regulator, inverter where applicable, lighting equipment and pole interfaces. This is a review checklist, not a standard package. Inclusion, supply responsibility and compatibility for every item must be confirmed in the written quotation.

Existing solar street-lighting project reference image
Existing solar street-lighting system illustration

Site and Lighting Requirements

  • project location, site plan and proposed lighting positions;
  • required lighting duty, operating schedule and project criteria;
  • available solar-resource information and known shading constraints;
  • environmental conditions and site-access limitations;
  • responsibility for lighting and power-component selection; and
  • inspection, access and maintenance expectations.

Pole and Installation Interface

Provide the proposed pole position and height, panel and lighting-equipment data, bracket geometry, equipment locations, cable route, access requirements, base or foundation concept and applicable electrical-safety information. Review the pole, mounted components and foundation as one project interface.

Information Required for Project Review

  • site and lighting-layout drawings;
  • lighting duty and operating-profile requirements;
  • available component datasheets and proposed responsibilities;
  • pole, bracket, cable and foundation-interface information;
  • applicable project requirements and requested documents;
  • quantity, programme and delivery destination; and
  • installation or interface constraints controlled by other parties.

Request a Technical Review

Submit the available project inputs and identify which components or activities are expected within the enquiry. No standard system scope, performance figure, service or supply responsibility should be assumed unless it is confirmed in the written quotation.